Owner/Client: City of Roseville
The proposed Dry Creek Greenway Multi-Use Trail consists of a 4.25 mile multi-use pathway between the existing Saugstad/Royer Park trail near Darling Way/Riverside Avenue on the west, to the City limits past the Old Auburn Road/South Cirby Way intersection on the east. The trail will serve as an alternative to using the busy City streets, as well as an important recreational amenity for residents. Ascent is conducting an environmental analysis to assist in the definition of alignments and preparing the CEQA and NEPA environmental documents for the project. The NEPA document is being prepared under Caltrans and FHWA procedures. Key issues include protection of the creek floodways, riparian habitat effects, construction noise and air quality, and neighborhood compatibility.